VoltgridNews

SK hynix Targets 100-Layer 3D DRAM Mass Production Around 2031

SK hynix engineer Choi Kang-sik said on Nov. 25 its first 3D DRAM will stack 100 cell layers, with mass production in four to five years; about 75 layers would match today's 10nm-class density.

Chips & Power Desk

2 min read

SK hynix DRAM chip package marked 1cnm DDR5 on a black background with the words DRAM and full stack AI memory creator

An SK hynix DRAM package from the company's newsroom. It is its current planar DRAM, not a 3D DRAM sample; SK hynix has not released images of 3D DRAM.

Image: SK hynix

Source · Press image from the SK hynix newsroom, used for news reporting.

SK hynix is targeting mass production of 3D DRAM in four to five years, around 2031, with a first product of 100 vertically stacked memory-cell layers, distinguished engineer Choi Kang-sik said at the Seoul National University AI Semiconductor Forum on Nov. 25. Choi called the timeline the goal of development.

TheElec, which attended the forum in Seoul's Gwanak district, quotes Choi saying about 75 layers would be needed to match the density of current 10-nanometer-class DRAM. "Taking other factors into account, the first product will start at 100 layers," he said. SK hynix has already fabricated 3D DRAM cells and verified their operating characteristics, including refresh characteristics comparable to conventional DRAM, according to TheElec. Pause Hardware, citing the same report, puts the comparison point at the company's 1c-generation 10nm-class DRAM.

The date is a target from an engineer's talk, not a product announcement. SK hynix has named no capacity, speed, price or customer for the part.

3D DRAM is not HBM. High-bandwidth memory (HBM) stacks finished DRAM dies on top of each other, and TheElec notes the technology also differs from DRAM placed on a logic die. In 3D DRAM the memory cells themselves are stacked inside one die, built by stacking and etching layers of silicon and silicon germanium (SiGe). The reason is scaling: as cell area shrinks, each capacitor holds less charge while leakage current and resistance rise, so stacking cells vertically offers more density without shrinking them further.

Layer Count, Tools and Materials for 3D DRAM

Choi said existing equipment can reach the layer count planned for the first product, but 200 to 300 layers or more would need dedicated tools. Longer term, SK hynix will explore more than 1,000 layers using multi-tier stacking and hybrid bonding, techniques already used in 3D NAND flash.

SK hynix's first 3D DRAM would start at 100 layers, with taller stacks needing new equipment, according to TheElec's report of the engineer's talk.

Graphic: Voltgrid News

Taller stacks make wiring and etching harder. SK hynix proposed a selector architecture that activates only the circuits a read or write needs, which Choi said could cut the area used for interconnects and lower electrical loading. The company is also looking at etch-integration methods from 3D NAND to lower cost, and at indium gallium zinc oxide (IGZO) instead of silicon as the transistor channel, because IGZO leaks less current and so can hold data longer. Choi named preventing changes in IGZO's characteristics from hydrogen and other factors as a remaining challenge, and called IGZO a possible breakthrough if its reliability can be ensured.

How 3D DRAM Fits SK hynix's Roadmap

The 2031 target follows earlier signals. At the IEEE VLSI Symposium in June 2025, SK hynix chief technology officer Cha Seon Yong said the company would adopt 4F² Vertical Gate (4F² VG) and 3D DRAM for nodes at 10nm and below, according to the company's release and TrendForce. On its Oct. 28 earnings call, SK hynix said it would stretch 6F2 DRAM with EUV before moving to 4F2 or 3D DRAM, as Voltgrid reported, without dates. Choi's talk adds a layer count and a production window that the earnings call did not give.

What Is Not Confirmed About the 3D DRAM Timeline

SK hynix has not published this timeline in a release or filing, and the figures come from one engineer's remarks as relayed by TheElec. The company has not said which fab, which customers or which products will use the first 3D DRAM. Cost, yield and the IGZO reliability question are open. Layer counts beyond 100 are an exploration, not a plan with dates.

Sources

Published
Sources
3 cited